Bozshakol and Aktogay projects’ short overview:
1) Bozshakol Copper Project
Location – Northern Kazakhstan, Pavlodar Region
• Mineral Resources Base – Copper
• Mine Life – more than 40 years
• Number of workers – 1750 personnel.
• Project capital cost – US $1.756 Billion
• Annual mining capacity – up to 30 Million Metric Tonnes
• Products output:
• Copper concentrate – up to 100 000 tonnes equivalent copper in
cathode per annum
• Molybdenum concentrate
• Gold
• Two processing plants – Sulphide Concentrator and Clay Plant.
2) Aktogay Copper Project
• Location – Eastern Kazakhstan region
• Mineral Resources base –Copper and Molybdenum
• Mine Life – 56 years
• Initial capital cost estimate of US $1.79 Billion
• Number of workers – 1550 personnel.
• Annual mining capacity – up to 25 Million Metric Tonnes
• Two processing plants – SX/EW Plant and Sulphide Concentrator
3) Bozshakol & Aktogay Sulphide Projects will process ore with the largest machines ever used.
The processing plant equipment includes:
• Gyratory crusher 1600 mm by 2900 from Fuller Traylor.
• 12.2 meter diameter SAG Mill with
• 8.5 meter diameter Ball mills
• High Pressure Grinding Rolls
• Flotation cells are 258 Cubic Meter Cylindrical Tank Cells
Mining equipment
• electric powered hydraulic face shovel excavators
• payload rear dump haul trucks
• Blast Hole Drills
Support equipment
• Tracked Dozers, Support Front End Loader (FEL) – Cat 994 or
similar
• Support Wheel Dozers, Support Backhoe Excavator, Water
Trucks, Graders, Explosives Truck etc.
Bozshakol and Aktogay are the future of Kazakhmys.